A 10x12 shed is 120 sq ft. The 10x12 plan set draws the foundation and floor, the walls and the roof framing, dimensioned, with a cut list and a materials list to price from.
A 10x12 is 120 sq ft. These plans build it as a gambrel barn shed with a loft, with lettered parts, a numbered step and drawing for each stage, a cut list and a shopping list.
Instant digital download. Secure checkout by Stripe. Generic DIY plans, not engineered or stamped. See what is inside
A 10x12 shed needs a 12 x 14 ft gravel pad (1 ft border), which is 3.2 tons of crushed stone at 4 in deep or 4.8 tons at 6 in. A 4 in concrete slab takes 1.63 cubic yards, or 74 bags of 80 lb mix; a paver base takes 71 pavers at 16 in.
By Glen · Last updated 2026-09-27 · Researched from manufacturer specifications, published code summaries and verified owner reviews · How we pick
For most 10x12 resin and steel kits, a 4 in compacted gravel pad inside a treated timber frame is the best value: it drains, stays level and costs a fraction of a slab. Every quantity below is computed for a 10 x 12 ft footprint. Change any assumption in the shed foundation calculator.
How much gravel for a 10x12 shed pad?
Crushed 3/4 in stone at about 1.4 tons per cubic yard, plus 10 percent for compaction. The border is how far the pad extends past the shed on each side.
Border
Pad size
4 in deep
6 in deep
None (flush)
10 x 12 ft
1.63 yd³ / 2.3 t
2.44 yd³ / 3.4 t
1 ft (recommended)
12 x 14 ft
2.28 yd³ / 3.2 t
3.42 yd³ / 4.8 t
2 ft
14 x 16 ft
3.04 yd³ / 4.3 t
4.56 yd³ / 6.4 t
Frame it with 52 linear ft of treated 4x6 or 6x6 timber, and lay about 185 sq ft of weed fabric (10 percent overlap) under the stone. See how to build a gravel shed pad for the order of work.
How much concrete for a 10x12 shed slab?
Thickness
Cubic yards
80 lb bags
60 lb bags
4 in
1.63
74
98
6 in
2.44
110
147
Includes 10 percent waste. At 74 bags, get a ready-mix quote: short-load fees still usually beat hand mixing this much. Slabs also need a compacted gravel sub-base and, in most towns, a permit or inspection once they pass a size threshold.
How many pavers or blocks for a 10x12 shed?
Base
Quantity
Notes
16 x 16 in pavers
71
over 4 in gravel and 1 in sand, 5% spare
12 x 12 in pavers
126
same base, more joints to level
Concrete deck blocks
16
4 runners, a block at each end and every 4 ft or less
Anchors
6
corners plus one per 6 to 8 ft of long wall
What does a 10x12 shed foundation cost?
Material only, as rough planning estimates. They vary by region and retailer, and delivery minimums often matter more than the per-ton price, so get a local quote before you order.
Foundation
Materials
4 in gravel pad (1 ft border)
$100 to $200
4 in concrete slab (bagged)
$350 to $650
16 in pavers on gravel and sand
$300 to $550
Foundation gear for a 10x12
Grid kits, weed fabric and the tools that make a pad flat.
Prices change often; the button shows today's price on Amazon.
Do you need a permit for the foundation?
The shed itself is exempt under the 120 and 200 sq ft rules, over a 100 sq ft rule. Concrete slabs sometimes trigger their own review even when the shed does not, and utility lines matter before any digging: call 811 a few days before you excavate or drive long anchors. Check your local code.
Prices change often; the button shows today's price on Amazon.
Gift guide: shopping for a shed owner or DIYer? See the Shed Holiday Gift Guide 2026 for picks by budget, from the big gift to stocking stuffers.
Frequently asked questions
How many bags of concrete for a 10x12 shed slab?
A 4 in slab for a 10x12 shed is 1.63 cubic yards including 10 percent waste. An 80 lb bag yields about 0.6 cu ft, so that is 74 bags of 80 lb mix, or 98 bags of 60 lb. At 6 in thick it rises to 110 bags. Above about 60 bags, ordering ready-mix is usually cheaper and much less work than mixing by hand.
How big should a gravel pad be for a 10x12 shed?
Make the pad 1 ft larger than the shed on every side, so 12 x 14 ft for a 10x12. The border catches roof drip, keeps splash off the walls and gives you a level surface to stand on while assembling. Some kit manuals ask for 2 ft; at a 2 ft border the pad is 14 x 16 ft and takes 4.3 tons at 4 in.
How deep should gravel be under a 10x12 shed?
Four inches of compacted 3/4 in crushed stone is standard on firm, well-drained soil: 3.2 tons for this size. On clay, soft or wet ground go to 6 in (4.8 tons) and compact in two lifts. Pea gravel rolls underfoot and does not lock together, so avoid it for the structural layer.
How many anchors does a 10x12 shed need?
At minimum, one anchor at each of the four corners. Along the 12 ft walls, add one for every 6 to 8 ft of length, which gives about 6 anchors for a 10x12 in a typical yard, more in open or coastal sites. Use earth auger anchors on gravel or soil and wedge anchors into a concrete slab, and follow the kit's own anchoring instructions.
This page is researched guidance, not professional engineering, legal or building-code advice. Sizes, loads and permit rules vary by product and by town: check your local code and the kit manufacturer's instructions before you build.