Reference chart
Gravel for a shed pad, by size
Pad prep gear
Matched to this chart, budget to premium.
Prices change often; the button shows today's price on Amazon.
With a 1 ft border and 4 in of compacted 3/4 in stone, an 8x10 shed pad takes 2.3 tons, a 10x12 takes 3.2 tons and a 12x16 takes 4.8 tons. Go to 6 in on soft or wet soil.
This chart saves you from guessing how much stone to order. Find the shed size and read the tons needed for a pad that extends 1 ft past the shed on every side, with 4 in of compacted crushed stone.
Pad = shed footprint plus 1 ft on every side. Stone at 1.4 tons per cubic yard, plus 10 percent for compaction. Weed fabric includes 10 percent overlap.
| Shed | Pad (ft) | 4 in yd³ | 4 in tons | 6 in yd³ | 6 in tons | Fabric sq ft |
|---|---|---|---|---|---|---|
| 4x4 | 6 x 6 | 0.49 | 0.7 | 0.73 | 1.0 | 40 |
| 3x6 | 5 x 8 | 0.54 | 0.8 | 0.81 | 1.1 | 44 |
| 4x6 | 6 x 8 | 0.65 | 0.9 | 0.98 | 1.4 | 53 |
| 5x5 | 7 x 7 | 0.67 | 0.9 | 1.00 | 1.4 | 54 |
| 5x6 | 7 x 8 | 0.76 | 1.1 | 1.14 | 1.6 | 62 |
| 4x8 | 6 x 10 | 0.81 | 1.1 | 1.22 | 1.7 | 66 |
| 6x6 | 8 x 8 | 0.87 | 1.2 | 1.30 | 1.8 | 71 |
| 5x8 | 7 x 10 | 0.95 | 1.3 | 1.43 | 2.0 | 77 |
| 4x10 | 6 x 12 | 0.98 | 1.4 | 1.47 | 2.1 | 80 |
| 6x8 | 8 x 10 | 1.09 | 1.5 | 1.63 | 2.3 | 88 |
| 7x7 | 9 x 9 | 1.10 | 1.5 | 1.65 | 2.3 | 90 |
| 5x10 | 7 x 12 | 1.14 | 1.6 | 1.71 | 2.4 | 93 |
| 6x10 | 8 x 12 | 1.30 | 1.8 | 1.96 | 2.7 | 106 |
| 7x9 | 9 x 11 | 1.34 | 1.9 | 2.02 | 2.8 | 109 |
| 8x8 | 10 x 10 | 1.36 | 1.9 | 2.04 | 2.9 | 111 |
| 7x10 | 9 x 12 | 1.47 | 2.1 | 2.20 | 3.1 | 119 |
| 6x12 | 8 x 14 | 1.52 | 2.1 | 2.28 | 3.2 | 124 |
| 7x11 | 9 x 13 | 1.59 | 2.2 | 2.38 | 3.3 | 129 |
| 8x10 | 10 x 12 | 1.63 | 2.3 | 2.44 | 3.4 | 132 |
| 7x12 | 9 x 14 | 1.71 | 2.4 | 2.57 | 3.6 | 139 |
| 6x14 | 8 x 16 | 1.74 | 2.4 | 2.61 | 3.7 | 141 |
| 8x12 | 10 x 14 | 1.90 | 2.7 | 2.85 | 4.0 | 154 |
| 7x14 | 9 x 16 | 1.96 | 2.7 | 2.93 | 4.1 | 159 |
| 10x10 | 12 x 12 | 1.96 | 2.7 | 2.93 | 4.1 | 159 |
| 8x13 | 10 x 15 | 2.04 | 2.9 | 3.06 | 4.3 | 165 |
| 8x14 | 10 x 16 | 2.17 | 3.0 | 3.26 | 4.6 | 176 |
| 10x12 | 12 x 14 | 2.28 | 3.2 | 3.42 | 4.8 | 185 |
| 8x15 | 10 x 17 | 2.31 | 3.2 | 3.46 | 4.8 | 188 |
| 8x16 | 10 x 18 | 2.44 | 3.4 | 3.67 | 5.1 | 199 |
| 10x14 | 12 x 16 | 2.61 | 3.7 | 3.91 | 5.5 | 212 |
| 12x12 | 14 x 14 | 2.66 | 3.7 | 3.99 | 5.6 | 216 |
| 8x18 | 10 x 20 | 2.72 | 3.8 | 4.07 | 5.7 | 221 |
| 10x16 | 12 x 18 | 2.93 | 4.1 | 4.40 | 6.2 | 238 |
| 8x20 | 10 x 22 | 2.99 | 4.2 | 4.48 | 6.3 | 243 |
| 12x14 | 14 x 16 | 3.04 | 4.3 | 4.56 | 6.4 | 247 |
| 10x18 | 12 x 20 | 3.26 | 4.6 | 4.89 | 6.8 | 264 |
| 12x16 | 14 x 18 | 3.42 | 4.8 | 5.13 | 7.2 | 278 |
| 14x14 | 16 x 16 | 3.48 | 4.9 | 5.21 | 7.3 | 282 |
| 10x20 | 12 x 22 | 3.59 | 5.0 | 5.38 | 7.5 | 291 |
| 12x17 | 14 x 19 | 3.61 | 5.1 | 5.42 | 7.6 | 293 |
| 12x18 | 14 x 20 | 3.80 | 5.3 | 5.70 | 8.0 | 308 |
| 14x16 | 16 x 18 | 3.91 | 5.5 | 5.87 | 8.2 | 317 |
| 12x20 | 14 x 22 | 4.18 | 5.9 | 6.27 | 8.8 | 339 |
| 10x24 | 12 x 26 | 4.24 | 5.9 | 6.36 | 8.9 | 344 |
| 14x20 | 16 x 22 | 4.78 | 6.7 | 7.17 | 10.0 | 388 |
| 12x24 | 14 x 26 | 4.94 | 6.9 | 7.41 | 10.4 | 401 |
| 16x20 | 18 x 22 | 5.38 | 7.5 | 8.07 | 11.3 | 436 |
| 12x30 | 14 x 32 | 6.08 | 8.5 | 9.13 | 12.8 | 493 |
Pad prep gear
Researched picks spread from budget to premium.
Prices change often; the button shows today's price on Amazon.
Other shed reference charts
- Shed size chart
- Equipment footprint chart
- Concrete for a shed slab, by size
- Shed roof pitch chart
- Shed roof snow load table
- Shed paint coverage chart
- Shed permit size thresholds
- Shed cost per square foot
Frequently asked questions
How much gravel do I need for a 10x12 shed?
A 10x12 shed needs a 12x14 pad with a 1 ft border. At 4 in deep that is about 3.2 tons of 3/4 in crushed stone, and the 6 in column in the chart above covers soft or wet soil.
How much gravel for a shed base in general?
It depends on the footprint: an 8x10 shed pad takes about 2.3 tons and a 12x16 about 4.8 tons at 4 in deep. Find your size in the chart, or use the gravel pad calculator for a custom pad.
What kind of gravel is best for a shed pad?
Angular crushed stone: 3/4 in clean stone for drainage, or a crusher-run blend with fines that compacts very firmly. Avoid round pea gravel for the structural layer, because it never locks together and shifts under the shed.
This page is researched guidance, not professional engineering, legal or building-code advice. Sizes, loads and permit rules vary by product and by town: check your local code and the kit manufacturer's instructions before you build.